The 11th refinery is one of the refineries under the South Pars gas refinery complex, the implementation of the phase 13 project was carried out by the Iranian Petropaydar Company (PPI), Mapna and Sadra under the management of the Pars Oil and Gas Company (POGC) on 11/07/2010. The project activities during the EPCC contract include technical and engineering services from basic design to detailed design, supply of goods, manufacturing and installation and management, planning and control of the pre-commissioning project, commissioning and functional testing in accordance with the latest standards and implementation methods. This refinery includes dry equipment for refining and storage of tank condensate. The 11th refinery is located on the site of two South Pars gas complexes in Tonbak sector and 230 km from Bushehr city. The feed of this refinery is supplied by reservoir fluid through two multiphase lines (two 32-inch lines) from 4 platforms (SPD13A/B/C/D) to the onshore system. The total capacity of the 11th refinery onshore facilities is 2000 million standard cubic feet per day of reservoir fluids. The 11th Refinery includes all the processing units, utilities, offsite and necessary infrastructures for the production of export gas, ethane, propane, butane, sulfur and condensates, which are as follows.
پیمانکار ساخت | واحد |
---|---|
AGP | 102.110.143(off spec) |
Khashayr pars | 100,1031,181 |
Mapna | 106,108,111,120,121,123,124,126B,127,128,129,130,131,132,144,145,146,184,187,188,189, 192 |
Mohammadian | 160 |
NA (notash afra) | 143,147,148, 191 |
Omran sanat | 140,142 (outside), 147,148(storage) |
Payandan | 101,104,105,182 |
Payandan | 101,104,105,182 |
petrohamgam | 1071,1161,1831 |
PLE | 1032 |
Radira | N.I. B |
Sapec | 1072,1162,1832 |
Sazeh fafarfan | 109,122,113,114,115,140,141,142(inside),185,186,190 |
لازم به ذکر است راه اندازی واحد های پالایشگاهی توسط شرکتهای تکنو انرژی سپهر کیش و مپنا انجام شده است.